Operations Guide

Overview

This section covers day-to-day operational procedures for the Dilution Control System. Proper operational practices ensure optimal control performance and system longevity.

Daily Operations

The following tasks should be performed regularly to maintain optimal system performance:

System Startup Checklist

Normal Operation Monitoring

During normal operation, periodically check the following:

  • Profile 2-Sigma: Should remain within acceptable limits (typically < 2%)
  • Valve Positions: Should not be saturated at limits
  • Control Actions: Position deltas should be small and stable
  • Alarms: Address any new alarms promptly
Best Practice

Use the trend displays to monitor long-term performance. Look for gradual drift in valve positions which may indicate changing stock conditions or valve wear.

Grade Changes

Grade changes involve switching from one paper product to another, requiring different basis weight targets and control parameters.

Quick Grade Change Procedure

  1. Select the target grade from the Grade Manager
  2. Optionally switch to Manual mode for large changes
  3. Apply the grade settings
  4. Wait for basis weight to stabilize
  5. Enable Auto mode when ready

View complete Grade Change documentation →

Valve Flushing

Regular valve flushing prevents fiber buildup and maintains accurate valve positioning.

Flushing Options

Flushing Type Description When to Use
Automatic Scheduled flushing at configured intervals Normal operation
Manual Single Flush one specific zone Addressing stuck valve
Manual All Flush all zones sequentially After extended downtime

View complete Valve Flushing documentation →

Routine Maintenance

Regular maintenance tasks help ensure system reliability:

Weekly Tasks

  • Review alarm history for recurring issues
  • Check valve position trends for any zones showing drift
  • Verify automatic flushing is functioning correctly

Monthly Tasks

  • Backup system configuration and grade database
  • Review control performance statistics
  • Check PLC and network equipment indicators
  • Verify scanner calibration status with QCS vendor

Annual Tasks

  • Full system backup including all logs
  • Review and update grade database entries
  • Valve inspection and calibration check
  • Software update assessment
Important

Always create a backup before performing software updates or making significant configuration changes.